Explanation
This ordinance is a modification to ordinance # 0603-2010. The project will now include park lighting and electrical, which was not in the original scope of services. The existing lighting fixtures along the path have been abandoned for 10 years and are no longer serviceable.
The work will include the design of lighting plans, which includes a new run that will be contained within the City's right-of-way. The existing lighting run will be removed in its entirety.
This connector will provide connectivity for cyclists and pedestrians from the Scioto Trail to an underpass beneath the Main Street bridge. The connector will allow for north and south travel along the path without an at-grade crossing of Main St. The project increases safety for the cyclists, pedestrians, and motorists.
The project is identified as a key improvement in the Central Ohio Greenways Plan.
The Contract Compliance No. for EMH&T is 31-0685594. Contract compliant through 09/21/2011. An MBE will be utilized, CTL Engineering, Contract Compliance #31-0680767.
Emergency legislation is requested so that the project can begin immediately and allow for the project to be constructed concurrent with the opening of the Scioto Mile Park.
Title
To authorize the Director of Recreation and Parks to modify the contract with EMH&T for professional services related to the Scioto Trail-Main Street Bridge Connector to include park lighting and electrical; to authorize an expenditure of $6,136.00 from the Voted 1999/2004 Parks and Recreation and Bond Fund; and to declare an emergency. ($6,136.00)
Body
WHEREAS, this engineering contract for EMH&T will be the second phase of the Scioto Trail-Main Street Bridge Connector; and
WHEREAS, this modification will provide for the design of lighting plans for park lighting and other electrical, which was not in the original scope of services; and
WHEREAS, an emergency exists in the usual daily operation of the ...