Explanation
BACKGROUND: The Hap Cremean Water Plant (HCWP) was originally constructed in the early 1950's with periodic additions and rehabilitation to the plant since initiation. During the initial construction asbestos containing materials were installed. This contract provides professional engineering services for preparation of drawings and specifications for the identification and removal of asbestos from miscellaneous buildings, for the replacement of the heating system for the main treatment building at HCWP, and construction administration and inspection services. This contract modification will provide for engineering design for changes which were implemented after evaluating energy efficiency and environmental issues which prompted a re-design for the back-up fuel system from previously utilized fuel oil to proposed new propane gas system. These changes were not originally anticipated or included in the original project scope but were implemented after discussions with Water Treatment Plant staff and the design consultant. Additional costs have been added for construction administration and construction inspection services do to a longer contract duration than originally anticipated, in part due to the additional construction for the back-up fuel system.
CC 329.16 CONTRACT MODIFICATIONS:
1. Amount of additional funds to be expended under this modification: $74,688.19
CONTRACT AMOUNT:
Original contract amount $258,905.00
Modification No.1 $74,688.19
New contract amount $333,593.19
2. The extent of additional services provided are needed due to engineering design changes w...
Click here for full text