Explanation
1. BACKGROUND:
A. Need: This legislation authorizes the Director of Public Utilities to execute a contract with Reynolds Inliner, LLC, for the construction of the Stanton Area Sanitary Improvements Project. The work consists of furnishing all labor and materials for repair and rehabilitation of 16,820 feet of 8-inch diameter, 1,810 feet of 10-inch diameter, 3,330 feet of 12-inch diameter, and 3,180 feet of 15-inch diameter sanitary sewer utilizing Cured-in-Place Pipe (CIPP). The work includes cleaning, video inspection, lateral sewer reestablishment, bypass pumping, maintenance of traffic, open cut point repairs, and other associated work. This work also includes the replacement of 360 feet of 8-inch diameter sanitary sewer, and the rehabilitation of manholes, including the replacement of the frames and covers, cementitious lining, and the installation of a flexible manhole sealant coating and other such work as may be necessary to complete the contract in accordance with the plans (CC-14344) and specifications. All work shall be completed within 360 days from date of the Notice to Proceed.
The Director of Public Utilities publicly opened two competitive bid proposals on December 19, 2007. These bids were: Reynolds Inliner $1,828,005.60 and Kokosing Construction $2,422,036.32. The Engineer's Estimate for this project was $1,896,148.80.
B. CONTRACT COMPLIANCE INFORMATION:
Number: 01-0684682
Expires: 08/12/2008
Type of Business Enterprise: Majority
C. Emergency Designation: Emergency designation is not required
2. FISCAL IMPACT:
Monies for this project will utilize funds from the Sanitary Sewer Revenue Bonds Fund. This legislation includes a transfer of funds within the Sanitary Sewer Revenue Bonds Fund and an amendment to the 2007 Capital Improvements Budget to allow sufficient cash and authority to cover the project expenditure.
Title
To authorize the Director of Public Utilities ...
Click here for full text