File #: 0883-2008    Version: 1
Type: Ordinance Status: Passed
File created: 5/16/2008 In control: Utilities Committee
On agenda: 6/23/2008 Final action: 6/25/2008
Title: To authorize the Director of Public Utilities to modify and increase the construction contract with U.S. Utility Contractor Co. for the Underground Street Lighting System Rehabilitation and Betterments Project (Southeast and Southwest); for quantity overruns and equipment purchases not accounted for in the original contract; for the Division of Power and Water (Power); to authorize the expenditure of $41,753.69 within the Voted Street Lighting and Electricity Distribution Improvement Fund; and to declare an emergency. ($41,753.69)
Attachments: 1. CONTRACTMODSE&SWDirector's Legislation Information Sheet - Updated as of 7-20-07.pdf, 2. CONTRACTMODSE&SWREHAB&BETTERMTS.pdf, 3. CONTRACTMODSE&SWRequest for CIP Legislation Form1 (Revised 7-26-07).pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
6/25/20081 CITY CLERK Attest  Action details Meeting details
6/24/20081 MAYOR Signed  Action details Meeting details
6/23/20081 Columbus City Council ApprovedPass Action details Meeting details
6/23/20081 COUNCIL PRESIDENT Signed  Action details Meeting details
6/13/20081 Auditor Reviewer Reviewed and Approved  Action details Meeting details
6/13/20081 CITY AUDITOR Reviewed and Approved  Action details Meeting details
6/13/20081 Utilities Drafter Sent for Approval  Action details Meeting details
6/13/20081 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
6/13/20081 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
6/12/20081 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
6/12/20081 Utilities Drafter Sent for Approval  Action details Meeting details
6/11/20081 EBOCO Reviewer Sent for Approval  Action details Meeting details
6/10/20081 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
6/10/20081 Utilities Drafter Sent for Approval  Action details Meeting details
6/9/20081 Finance Reviewer Reviewed and Approved  Action details Meeting details
6/5/20081 Utilities Drafter Sent for Approval  Action details Meeting details
6/4/20081 Utilities Reviewer Sent for Approval  Action details Meeting details
6/4/20081 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
6/3/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
6/3/20081 Utilities Drafter Sent for Approval  Action details Meeting details
6/3/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
6/3/20081 Utilities Drafter Sent for Approval  Action details Meeting details
5/29/20081 Utilities Drafter Sent for Approval  Action details Meeting details
5/29/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
5/21/20081 Utilities Drafter Sent for Approval  Action details Meeting details
5/21/20081 Utilities Reviewer Sent for Approval  Action details Meeting details
5/20/20081 Utilities Drafter Sent for Approval  Action details Meeting details
5/20/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
5/19/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
5/16/20081 Utilities Drafter Sent for Approval  Action details Meeting details
5/16/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
Explanation

BACKGROUND: This Ordinance authorizes the Director of Public Utilities to modify and increase the construction contract with U.S. Utility Contractor Co. for the Underground Street Lighting System Rehabilitation and Betterments Project (Southeast and Southwest Quadrants), for the Division of Power and Water (Power). Due to variables such as soil content, moisture and atmospheric temperatures the quantity of ground rods required for grounding and bonding was unknown. A pilot project was used to identify the estimated number of ground rods required for grounding and bonding. This one and only modification authorizes payment for quantity overruns for ground rod installation, so that street lights are in conformance with National Electric Safety Code NESC - Article 250. It is necessary to modify and increase the original contract to account for these additional expenditures.

1. Amount of additional funds to be expended: $41,753.69
Original Contract Amount: $681,119.59
Amount of original contract and this modification: $722,873.28

2. Reasons additional goods/services could not be foreseen:
In order for the Division to meet current specifications and standards for grounding and bonding street light poles, additional ground rods are required to conform to 25 Ohms or less per National Electric Safety Code NESC - Article 250. A pilot project failed to accurately predict the number of ground rods required for grounding and bonding. Atmospheric conditions and soil content are variables which affect the need for grounding and bonding.

3. Reason other procurement processes are not used:
Due to this contract playing a vital role in the Division's effort to provide a safe street lighting system to the public it is felt, to expedite construction, that the existing contract be modified. It would not be in the best interest of the City to contract with another vendor for the same service U.S. Utility Contractor Co. is currently prov...