Explanation
1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into an agreement with ms consultants, inc. in the amount of $394,406.00, for professional engineering services for the Parsons Avenue Water Plant Sludge Disposal Project. Residual production, transportation and disposal of sludge is a continual part of the water treatment process.
This project entails professional consulting/engineering firms to provide full-service assistance to the City for the site assessment of the containment embankments of three existing sludge lagoons at the Parsons Avenue Water Plant (PAWP), the decant structures and piping within the lagoons, and the proposed process for removing and disposing of the lime softening sludge from the lagoons. The selected consulting/engineering firm is to provide to the City a written technical report(s) summarizing the results from the assessment and make recommendations for improvements and/or alterations with associated cost analysis. The selected consulting/engineering firm will then prepare construction plans and specifications for selected improvements and/or alterations that are a current priority to the City, and the City determines to be the most economical and environmentally conscientious solution. Once the plans and specifications are approved by the City, the consulting/engineering firm will provide construction administration/construction inspection services for the bid and construction phase activities. These services will be included in a future contract modification when a more accurate assessment of the cost can be determined.
A second phase of the project will inspect the lagoons and embankments after the initial cleaning work has been completed to determine if the lagoon modifications are needed. This work will be performed as a future planned contract modification. This work will include supplemental geotechnical evaluations, and assessment of decant structures and piping. ...
Click here for full text