Title: To authorize the Director of Public Utilities to modify the professional engineering services agreement with Burgess & Niple, Inc., for the Jackson Pike Wastewater Treatment Plant New Headworks Project; to authorize the transfer within and the expenditure of $166,026.00 from the Sanitary Sewer General Obligation Bond Fund; and to amend the 2011 Capital Improvements Budget; ($166,026.00)
Attachments: 1. Ord 0563-2012 BN Mod #6 LEGISLATIONB 022212, 2. Ord 0563-2012 Sub-Contractor WIF 650252-100000 JPWWTP New Headworks B&N Signed
Explanation

1. BACKGROUND:

A. Need. This legislation authorizes the Director of Public Utilities to modify the professional engineering services agreement with Burgess & Niple, Inc., for the Jackson Pike Wastewater Treatment Plant New Headworks Project, for the Division of Sewerage and Drainage. Engineering services for this project are being funded incrementally by contract modification as portions of the work are undertaken to advance the project through planning, engineering design and construction of facilities. This modification, Mod #6, provides additional funding for "Services During Construction" tasks for contract J217. The cost of the modification is a continuation of the vendor's current pricing structure, as verified by City staff. The Division has determined that these services cannot be performed by City personnel at this time, and has planned for the procurement of these services on a routine basis.

Contract J217 - Truck Waste Disposal Facility (TWDF) Preliminary Treatment Process
Provides a Preliminary Treatment Process facility consisting of a masonry building, septage treatment equipment, new sewers, concrete pavement and associated site work at the TWDF. The TWDF is owned by the City of Columbus and is operated and maintained by Kurtz Brothers for the City, per the Organic Waste Recovery and Reuse System (OWRSS) Agreement, Modification No. 2.

Amount of additional funds to be expended: $166,026.00
Original Contract $ 5,878,960.00
Modification No. 1 $ 360,494.00
Modification No. 2 $ 946,327.00
Modification No. 3 $ 182,805.00
Modification No. 4 $ 343,075.00
Modification No. 5 $ 532,672.00
Modification No. 6 (Current) $ 166,026.00
CURRENT PROPOSED TOTAL $ 8,410,359.00

Reaso...