File #: 1006-2012    Version: 1
Type: Ordinance Status: Passed
File created: 5/1/2012 In control: Public Utilities Committee
On agenda: 6/11/2012 Final action: 6/12/2012
Title: To authorize the Director of Public Utilities to enter into a professional engineering services contract modification with EMH&T, Inc., in connection with the Blacklick Creek Sanitary Interceptor Sewer, Part 6C Project; and to authorize the appropriation and transfer of funds from the Sanitary Sewer Reserve Fund, to the Sanitary Sewer General Obligation Bond Fund, to authorize the expenditure of $5,706,025.31 from the Sanitary Sewer General Obligation Bond Fund; and to amend the 2012 Capital Improvements Budget; for the Division of Sewerage and Drainage. ($5,706,025.31).
Attachments: 1. Ord 1006-2012 Director's Legislation Information Sheet (Revised 04-06-10)_(034.6C - Mod #1)_v3, 2. Ord 1006-2012 Exhibit 1 MAP - Blacklick Extension to Smiths Mill Rd (2012_03_05) Map, 3. Ord 1006-2012 Sub-Contractor WIF 650034-100006 Blacklick Creek Interceptor Signed
Explanation
1. BACKGROUND:

This legislation authorizes the Director of Public Utilities to modify the professional engineering services agreement with EMH&T, Inc., in connection with the Blacklick Creek Sanitary Interceptor Sewer, Part 6C Project. The consultant has performed the requisite field surveys, geotechnical investigations, and hydraulic calculations necessary to generate the Preliminary Engineering Report which outlined the recommended horizontal and vertical alignments for the proposed sewer. The report concluded that the most economical method for constructing the sewer will be via tunneling methods.
In the future the consultant will perform all necessary geotechnical investigations, field surveys, obtain and prepare all permits necessary, generate detailed construction plans and specifications, prepare site-specific maintenance of traffic plans, and supply all construction documents required for bidding. There is at least one future modification planned. The updated contract timeline is January 2015.

Amount of additional funds to be expended: $5,706,025.31
Original Contract $ 2,137,198.16
Modification # 1 Current $ 5,706,025.31
Future Modifications #2 $ 1,600,000.00
Current Proposed Total: $ 9,443,223.47

Reasons additional goods/services could not be foreseen:
This modification was anticipated and explained in the original contract. The amount of the modification has increased due to rate increases that occurred while the project was on hold, and due to a more thorough understanding of the extent of field investigations required to mitigate the project risks during construction phase.

Reason other procurement processes are not used:
Given the highly technical nature of the project and the specialized knowledge of the project area required to complete the services, it would be more costly to solicit proposals for completion of the services by other partie...