File #: 0772-2013    Version: 1
Type: Ordinance Status: Passed
File created: 3/18/2013 In control: Public Utilities Committee
On agenda: 6/3/2013 Final action: 6/5/2013
Title: To authorize the Director of Public Utilities to modify the construction contract with Layne Inliner LLC (formerly Reynolds Inliner LLC) in connection with the Franklin Main Interceptor Rehabilitation, Phase 3: Nationwide Blvd to Buttles Avenue Project. ($0.00)
Attachments: 1. Ord 0772-2013 Director's Legislation Information Sheet (5-23-11) (4), 2. Ord 0772-2013 Sub-Contractor WIF 650600-100008 $0 Mod
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a construction modification contract with Layne Inliner LLC (formerly Reynolds Inliner, LLC) for the Franklin Main Interceptor Rehabilitation, Phase III: Nationwide Blvd to Buttles Avenue for the Division of Sewerage and Drainage. This contract modification is to change the scope of work of the current contract to include Cured-in-Place Pipe (CIPP) lining for a section of the Franklin Main Interceptor sewer located in the Ohio State University Area. The CIPP will be more cost effective than complete replacement and extend the life of this infrastructure. This modification will utilize existing contract monies, no additional monies are required. The contract completion date will be extended from February 24, 2013, to June 30, 2013.

2. MODIFICATION INFORMATION:
2.1. Amount of additional funds to be expended: $0.00
Original Contract Amount: $2,140,987.20
Modification #1: $ 0.00
Total (Orig. + Mod # 1) $2,140,987.20

2.2. Reasons additional goods/services could not be foreseen.
The original contract included contingency for investigating the need for CIPP lining several sections of the Franklin Main Interceptor within the scoped project area. The full contingency amount was not utilized. There is a section of the Franklin Main Interceptor located further north in the OSU area that requires CIPP lining. The CIPP is more cost effective than a complete pipe replacement. Beside the cost factor the area in which the infrastructure is located would require cutting across Lane Avenue, St. John Arena parking lot and across Woody Hayes Drive if a pipe replacement was done. That process would be more disruptive to the neighborhood area. This contract modification will utilize the remaining funds to CIPP line this section of the Franklin Main Interceptor in the OSU area.
2.3. Reason other pr...