header-left
File #: 0644-2014    Version: 1
Type: Ordinance Status: Passed
File created: 3/6/2014 In control: Recreation & Parks Committee
On agenda: 3/24/2014 Final action: 3/26/2014
Title: To authorize the City Auditor to transfer $86,543.00 within the voted Recreation and Parks Bond fund 702; to amend the 2013 Capital Improvements Budget Ord. 0645-2013; to authorize and direct the Director of Recreation and Parks to modify a contract with Gutknecht Construction Co. for the Far East and Carriage Place Facility Renovations Project for costs associated with emergency sanitary sewer work; to authorize the expenditure of $86,543.00 from the Voted Recreation and Parks Bond Fund; and to declare an emergency. ($86,843.00)
Explanation
Background:
This ordinance will modify a contract with Gutknecht to pay for costs associated with emergency sanitary sewer work that was discovered during the demolition portion of the Far East Recreation Center. The original contract was authorized by ordinance # 0944-2013. Replacement of some old lateral sanitary lines became necessary due to a failure that was discovered once the flooring was removed for replacement.

Project work consists of the following:
The work for which proposals are invited consists of: Interior renovation and upgrades to
portions of the Far East Community Center. Work includes renovation of existing spaces, areas
of systems, restroom upgrades, a vending and lounge area, and a general upgrade to the
existing finishes. Also included are upgrades to the existing mechanical and electrical systems
and a survey for any possible hazardous materials. Also part of the scope is the acquisition and
installation of a new gymnasium divider curtain in the Carriage Place Community Center, and
other such work as may be necessary to complete the contract in accordance with the plans
and specifications set forth in the Bid Submittal Documents.
Principal Parties:
Gutknecht Construction Co.
Jeff Feinman (Contact)
2280 Citygate Drive
Columbus, OH 43219
614-532-5410 (Phone)
31-0935568 (Contract Compliance) through: 8/7/15

Fiscal Impact: $86,843.00

Title
To authorize the City Auditor to transfer $86,543.00 within the voted Recreation and Parks Bond fund 702; to amend the 2013 Capital Improvements Budget Ord. 0645-2013; to authorize and direct the Director of Recreation and Parks to modify a contract with Gutknecht Construction Co. for the Far East and Carriage Place Facility Renovations Project for costs associated with emergency sanitary sewer work; to authorize the expenditure of $86,543.00 from the Voted Recreation and Parks Bond Fund; and to declare an emergency. ($86,843.00)

Body

WHEREAS, it is necessary to modify a contract wi...

Click here for full text