File #: 1783-2015    Version: 1
Type: Ordinance Status: Passed
File created: 6/26/2015 In control: Public Service & Transportation Committee
On agenda: 7/13/2015 Final action: 7/16/2015
Title: To amend the 2015 Capital Improvement Budget; to authorize and direct the City Auditor to appropriate and transfer $131,755.34 from the Streets and Highways Bonds Fund; to authorize the Director of Public Service to execute a professional engineering services contract modification with Stantec Consulting Services Inc. in connection with the Bikeway Development - Professional Services project; to authorize the expenditure of $131,755.34 from the Streets and Highways Bonds Fund; and to declare an emergency. ($131,755.34)
Explanation

1. BACKGROUND
This legislation authorizes the Director of Public Service to modify and increase the professional engineering services contract for the Bikeway Development - Professional Services (Bikeway Plan PE Services) project with Stantec Consulting Services Inc. in the amount of $131,755.34.

Various projects have spent down the total value of this contract. The intent of this contract was to provide the Department of Public Service with continuing, contractual access to additional resources that are necessary to perform various professional engineering, survey, and technical expertise for the department to complete its capital and operating budget commitments.

Work to be performed under this contract modification include, but is not limited to, providing additional funds to complete design work to finalize plans due to changes with the protected bike lane, and address design comments.

After the department reviewed the results from the signal warrants and traffic studies, the consultant presented the protected bike lane concept to the city. The city then made the decision to move forward with plan changes and built the first protected bike lane in the City of Columbus. Stantec Consulting Services Inc. originally designed the project and later the city determined that changes must be made by the engineer of record. The city also needed to maintain the ODOT project schedule for funding.

Original contract amount: $310,000.00 (Ord. 0191-2011, EL011399)
Modification 1 amount: $500,500.00 (Ord. 1790-2013, EL014693)
Modification 2 amount: $131,755.34
Total contract amount, including this modification: $942,255.34

Searches in the Systems for Award Management (Federal) and the Findings for Recovery list (State) produced no findings against Stantec Consulting Services Inc.

2. CONTRACT COMPLIANCE
Stantec Consulting Services Inc.’s contract compliance number is 112167170 and expires 11/6/15.

3. FISCAL IMPACT
Funding for this project i...