header-left
File #: 2621-2015    Version: 1
Type: Ordinance Status: Passed
File created: 10/13/2015 In control: Public Utilities Committee
On agenda: 11/23/2015 Final action: 11/24/2015
Title: To authorize the Director of Public Utilities to modify (Mod #1) the professional engineering services agreement with Chester Engineers, Inc. for the Roof Replacement Consulting Services for DPU Facilities; to authorize the transfer within and the expenditure of up to $400,000.00 from the Sanitary Sewer Super Build America Bond Fund; and to amend the 2015 Capital Improvements Budget, and to declare an emergency. ($400,000.00)
Attachments: 1. Ord 2621-2015 Sub-Contractor Work Identification Form-Award Mod 1 (2), 2. Ord 2621-2015 CIP 234 AWARD -Director's Information Sheet LEGISLATIONB
Explanation

1. BACKGROUND:

This legislation authorizes the Director of Public Utilities to modify (Mod #1) the professional engineering services agreement with Chester Engineers, Inc. for the Roof Replacement Consulting Services for DPU Facilities project, Capital Improvements (CIP) Project 650234-100000. The work to be performed under this contract will consist of investigations, inspections and evaluations of existing conditions, surveying, if required, preparation of engineering or architectural drawings, documents/drawings for permit approval, specifications and bid documents, technical project representation during construction, preparation of record plan drawings for projects and preparation of M & O Manuals, if required for various Department of Public Utilities facility’ roofs. The design of the roofs at different facilities will vary as to the type of roofing systems specified, and may include items such as structural repairs, drainage systems, relocation of rooftop equipment, installation of roof hatches and skylights, building lightning protection systems and installation of walkways. Current facilities to be serviced are DOSD facilities. Additional Department of Public Utilities facilities may be added in the future.

PROJECT MODIFICATION INFORMATION:

1.1 Amount of additional funds to be expended: $400,000.00

Original Contract $ 200,000.00
Modification No. 1 (Current) $ 400,000.00
Modification No. 2 (2016) $ 400,000.00
Modification No. 3 (2017) $ 400,000.00
Modification No. 4 (2018) $ 80,000.00
CURRENT PROPOSED TOTAL $1,480,000.00

1.2 Reasons additional goods/services could not be foreseen:
This Contract Modification No. 1 was planned and anticipated, and so stated in the original contract’s legislation. It is a planned continuation of the services originally included within the existing contract’s scope of service.

1.3 Reason other procurement processes are not used:
Due to the highly complex and t...

Click here for full text