header-left
File #: 0722-2016    Version: 1
Type: Ordinance Status: Passed
File created: 3/8/2016 In control: Public Service & Transportation Committee
On agenda: 3/28/2016 Final action: 3/30/2016
Title: To amend the 2015 Capital Improvement Budget; to authorize the City Auditor to transfer cash and appropriation within the Streets and Highways Bond Fund; to authorize the Director of Public Service to enter into contract with HNTB Ohio, Inc. for engineering, technical, and surveying services in connection with the Traffic Signal Installation - Columbus Traffic Signal System Phase E project; to authorize the expenditure of up to $1,300,000.00 from the Streets and Highways Bond Fund; and to declare an emergency. ($1,300,000.00)
Attachments: 1. Legislation Accounting Templates
Explanation
1. BACKGROUND
This legislation authorizes the Director of Public Service to enter into contract with HNTB Ohio, Inc., in the amount of up to $1,300,000.00 for the Traffic Signal Installation - Columbus Traffic Signal System Phase E project.

The Department of Public Service has initiated a procurement effort that will result in the award and execution of a detailed design contract. This project is the next phase of design and system integration during the migration of the existing Columbus Traffic Signal System (CTSS) to an open architecture that can serve central Ohio stakeholders with system connectivity and interoperability. The desired outcome is to transition approximately 250 existing signalized intersections to the central traffic control system installed in the CTSS B project, maximizing the infrastructure from the previous projects. This is the fifth in a series of projects based on the November 2005 Columbus Traffic Signal System Assessment and Strategic Plan.

Fiber optic cable, wireless devices, and other electronic equipment will be installed as part of this project. Underground interconnect infrastructure improvements will occur such as the replacement and expansion of conduit paths and duct banks. New conduit and pull boxes will be installed along SR-161 between I-270 and New Albany Road and along I-70 between Hilliard-Rome Road and I-270 and along SR-104 and US-33. It is anticipated that Franklin County, ODOT, and local municipalities will participate in the project either near these identified limits or near previously installed infrastructure.

MORPC currently has the project (PID 99733) scheduled for construction in State Fiscal Year 2019 with an allocation of Federal Congestion Mitigation and Air Quality (CM/AQ) funding.

The Department of Public Service, Office of Support Services, solicited Requests for Proposals for the Traffic Signal Installation - Columbus Traffic Signal System Phase E contract. The project was formal...

Click here for full text