File #: 0769-2016    Version: 1
Type: Ordinance Status: Passed
File created: 3/13/2016 In control: Public Utilities Committee
On agenda: 4/11/2016 Final action: 4/14/2016
Title: This legislation authorizes the Director of Public Utilities to enter into a planned modification of a professional engineering services agreement with URS Corporation - Ohio for the Big Walnut Augmentation / Rickenbacker Interceptor-Lockbourne Subtrunk; to authorize the appropriation and transfer of funds from the Sanitary Sewer Reserve Fund to the Sanitary Sewer General Obligation (G.O.) Bond Fund and to authorize the expenditure of $1,104,972.92 from the Sanitary Sewer General Obligation (G.O.) Bond Fund; and declare an emergency. ($1,104,972.92)
Attachments: 1. Ord 0769-2016 2 - Director's Legislation Information Sheet (650491.2) mod #3, 2. Ord 0769-2016 Fig3-1 MAP, 3. Ord 0769-2016 Sub-Contractor WIF 650491-100002 BWARI Lockbourne Subtrunk 062515, 4. Ord 0769-2016 Leg Temp 650491-2 BWARI Lockbourne
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a planned modification (Mod #3) of an existing professional engineering agreement with URS Corporation - Ohio for the Big Walnut Augmentation / Rickenbacker Interceptor-Lockbourne Subtrunk (BWARI -Lockbourne Subtrunk), CIP 650491-100002. The original contract was for the design of a 12-ft diameter tunnel including a 60-in diameter sanitary sewer. Modification #1 was for the re-design of the tunnel utilizing a 78-in diameter along the original alignment including a 60-in diameter sanitary sewer. Modification #2 was for the design of the new alignment required for the 78-in diameter tunnel along with the original 60-in sanitary sewer. Modification #3 contains both planned and unplanned items: Completion of a Value Engineering Study as well as engineering services during construction. Note: funding for this modification came from the cancellation of EL017639, which was created by Ordinance 1813-2015.

Modification #4 (Future): Engineering services during construction.

It should be noted that items A through D listed below are additional tasks that were added to the planned modification for engineering services during construction. It was requested that these items be added as a potential construction cost savings measure.

This contract modification authorizes the following:

a. Conduct a Value Engineering (VE) study of the project.
b. Make any plan, specification or Geologic Baseline Report (GBR) changes required/recommended from the VE process.
c. Completion of an independent construction cost estimate.
d. Evaluate gravity connection options for Rickenbacker lift station 904 to the future Lockbourne Intermodal Sewer (LIS) subtrunk.
e. Complete the required Permits to Install (PTI) permits.
f. Conduct the first 12 months of engineering services during construction as detailed in the attached scope document (for the remainder of the Engineering Services ...

Click here for full text