File #: 3010-2016    Version: 1
Type: Ordinance Status: Passed
File created: 11/15/2016 In control: Public Utilities Committee
On agenda: 1/9/2017 Final action: 1/12/2017
Title: To authorize the Director of Public Utilities to modify (Mod #1) an existing engineering agreement with CDM Smith, Inc. for the Blueprint Linden, Agler / Berrell Area project; to authorize the transfer of $783,791.76 within and the expenditure of up to $1,183,791.76 from the Sanitary Sewer General Obligation Bond Fund (G.O.); and to amend the 2016 Capital Improvements Budget. ($1,183,791.76)
Attachments: 1. Ord 3010-2016 SWIF 5. Schedule 2A-1 Subcontractor Work ID Form (Linden Mod #1)_CDM_Smith, 2. Ord 3010-2016 Director's Legislation Info Sheet (Linden Mod#1), 3. Ord 3010-2016 DAX Financial Coding Agler Berrell Mod 1
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to modify (Mod #1) an engineering agreement with CDM Smith, Inc. for the Blueprint Linden, Agler / Berrell Area Project, CIP 650870-100703. The scope of work for this proposed phase of the project is as follows: (1) to refine the recommendations included in the Preliminary Design Report previously developed as part of the initial phase of work; (2) provide detailed design services to produce fully independent construction documents for the green infrastructure technologies; (3) provide other related work items necessary to achieve the project goals of: mitigating Designed Sewer Relief (DSR) activations, reduce Water In Basement (WIB) occurrences, and street/yard flooding; and (4) provide storm water detention and treatment via the re-purposing of Columbus Land Redevelopment Office (Land Bank), abandoned, and vacant parcels for the implementation of Green Infrastructure (GI). The specific work activities of this scope include development of detailed construction drawings and bidding documents, meetings with stakeholders, submission of permits, and providing responses to all contractors inquires during the bidding process.

1.1 Amount of additional funds to be expended: $1,183,791.76

Original Contract $1,599,336.26
Modification No. 1(Current) $1,183,791.76
CURRENT TOTAL $2,783,128.02

Modification No. 2 (Future) $ 200,000.00
Future Total $2,983,128.02

1.2 Reasons additional goods/services could not be foreseen:
This Contract Modification No. 1 was planned and anticipated, and so stated in the original contract’s legislation.

1.3 Reason other procurement processes are not used:
Re-bid of the project will likely result in a higher project costs as much of the project history would be lost and required to be rediscovered by another consultant unless won by th...

Click here for full text