File #: 0947-2018    Version: 1
Type: Ordinance Status: Passed
File created: 3/26/2018 In control: Public Utilities Committee
On agenda: 5/7/2018 Final action: 5/10/2018
Title: To authorize the Director of Public Utilities to modify and increase an existing Construction Administration and Construction Inspection (CA/CI) services agreement with Stantec Consulting Services, Inc. for the Fairwood / Griggs Radio Replacement Project and the Alum Creek Trunk (Middle) Rehabilitation Project; to authorize the transfer within and an expenditure of up to $335,591.49 from the Sanitary Sewer G.O. Bond Fund. ($335.591.49)
Attachments: 1. Ord 0947-2018 Mod 4 Director's Legislation Info Sheet, 2. Ord 0947-2018 650580 Fairwood Griggs Schedule 2A-1, 3. Ord 0947-2018 DAX Financial Form Alum Creek Middle & Fairwood Griggs, 4. Ord 0947-2018 650725-100015 Alum_Creek_Schedule 2A-1
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to modify (Mod #4) an existing construction administration and construction inspection (CA/CI) services contract with Stantec Consulting Services, Inc. The services for this contract include oversight of projects during construction to ensure that work performed by the construction contractor conforms to project plans and specifications. Stantec Consulting Services, Inc. will perform construction administration/inspection services for Division of Sewerage Capital Improvement Projects that commence construction during the years 2017 through 2019. The contract will be modified as needed throughout the three (3) year period to include these projects as they go to construction. Projects are located throughout the City of Columbus.

Current CA/CI Projects: Fairwood / Griggs Radio Replacement Project, CIP 650580-100000
Alum Creek Trunk (Middle) Rehabilitation Project, CIP 650725-100015

1.1 Amount of additional funds to be expended: $335,591.49
Original Contract $ 576,954.73
Modification #1 $ 888,439.81
Modification #2 $ 277,445.17
Modification #3 $ 300,000.00
Modification #4 (this Ordinance) $ 335,591.49
Future 2018 Anticipated Needs $ 4,664,000.00
Future 2019 Anticipated Needs $ 3,000,000.00
CONTRACT TOTAL $10,042,431.20

1.2 Reasons additional goods/services could not be foreseen:
This was planned contract modification.

1.3 Reasons other procurement processes are not used:
This is a multiyear contract that will be modified as required to provide construction administration/inspection services for construction projects that commence during the three year (2017-2019) timeframe.

1.4 How cost of modification was determined:
The cost of Mod #4 was determined by negotiations between Stantec and DOSD.
2. PROJECT TIMELINE: Construction administration...