File #: 2310-2018    Version: 1
Type: Ordinance Status: Passed
File created: 8/13/2018 In control: Public Utilities Committee
On agenda: 9/24/2018 Final action: 9/27/2018
Title: To authorize the Director of Public Utilities to enter into a professional engineering services agreement with Advanced Engineering Consultants, Ltd. for the DOSD HVAC and Air Purification System Replacements, No.1; to authorize the transfer within and the expenditure of up to $400,000.00 from the Sanitary Sewer General Obligation Bond Fund; and to amend the 2018 Capital Improvements Budget. ($400,000.00)
Attachments: 1. Ord 2310-2018 5. New Utilization Form Scope Negotiations, 2. Ord 2310-2018 DAX Financial Form 650265-100100, 3. Ord 2310-2018 17. Director's Legislation Information Sheet (2-8-2018)

Explanation

 

1.  BACKGROUND:  This legislation authorizes the Director of Public Utilities to enter into a professional engineering services agreement with Advanced Engineering Consultants, Ltd. for the DOSD HVAC and Air Purification System Replacements, No. 1, CIP 650265-100100. This project will be initially funded to address various DOSD Facilities.  Many of the HVAC & Air Purification Units are approaching the end of their useful life and are becoming increasingly difficult to repair, maintain, and update controller software programs.  A HVAC & Air Purification Unit survey will be prepared for the Division's various buildings, including both Waste Water Treatment Plants, the Compost facility, and the Sewer Maintenance and Operations Center to determine the age and condition of the current equipment.  This report will be the guiding document to schedule and replace the failing units on a priority basis.  This project will include preliminary engineering, and detailed design, and services during construction for the units selected for each year of construction. Four additional renewals are anticipated.

 

2.   PROCUREMENT: The Division advertised for a Request for Proposals (RFP’s) for the subject services on the City’s Vendor Services website and in the City Bulletin in accordance with the overall provisions of Section 329 of the Columbus City Code. The Division of Sewerage and Drainage received two (2) proposals on June 15, 2018 from the following companies:

 

Name                                                     C.C. No. / Exp. Date | Vendor # | City/State  | Status                     

Advanced Engineering Consultants, Ltd.  | 31-1612308 | 5/25/2020 | 005665 | Columbus, OH | FBE                     

Star Consultants                             | 31-1558857 | 4/13/2019 | 005568 | Columbus, OH | MBE

Advanced Engineering Consultants, Ltd. was selected as the lowest best, responsible vendor.

 

3.                     Project Timeline: This is anticipated to be a 5 year contract with annual renewals.  Adjustments to fees and scope will be made by contract renewal based on annual (or semiannual) proposals as requested by the City. The expected end date of the contract is fourth quarter 2023, but the duration of the contract may extend into subsequent years based on the complexity and progress of the assigned work.

 

4.   Contract Compliance No.:  31-1612308 | Expires 5/25/2020 | FBE | Vendor # 005665

 

5.                     Economic / Environment Impact:   This project is necessary for replacement of failing HVAC systems at our facilities.  Environmental benefits will likely be inherent in the project, because newly designed units will likely be more energy efficient.  No community outreach or input is believed to be necessary.

 

6.  Fiscal Impact: This legislation authorizes the transfer within and the expenditure of up to $400,000.00 from the Sanitary Sewer General Obligation Bond Fund 6109 and an amendment to the 2018 Capital Improvements Budget.

 

Title

 

To authorize the Director of Public Utilities to enter into a professional engineering services agreement with Advanced Engineering Consultants, Ltd. for the  DOSD HVAC and Air Purification System Replacements, No.1; to authorize the transfer within and the expenditure of up to $400,000.00 from the Sanitary Sewer General Obligation Bond Fund; and to amend the 2018 Capital Improvements Budget. ($400,000.00)

 

Body

 

WHEREAS, the Department of Public Utilities advertised for a Request for Proposals for the  DOSD HVAC and Air Purification System Replacements, No. 1, CIP 650265-100100 on the City’s Vendor Services website and in the City Bulletin in accordance with the overall provisions of Section 329 of the Columbus City Code; and

 

WHEREAS, Advanced Engineering Consultants, Ltd. was selected as the vendor to provide a survey for the Division’s various buildings to determine the age and condition of the current HVAC and Air Purification equipment for the Division  of Sewerage and Drainage (DOSD) facilities; and

 

WHEREAS, it is necessary to authorize the transfer within and expend up to $400,000.00 from the Sanitary Sewer G.O. Bond Fund 6109; and

 

WHEREAS, it is necessary to authorize an amendment to the 2018 Capital Improvements Budget; and

 

WHEREAS, it has become necessary in the usual daily operation of the Division of Sewerage and Drainage, Department of Public Utilities, to authorize the Director to enter into a professional engineering services agreement with Advanced Engineering Consultants, Ltd. for the DOSD HVAC and Air Purification System Replacements, No. 1, CIP 650265-100100 for the preservation of the public health, peace, property, safety, and welfare; now, therefore

 

BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:

 

SECTION 1: That the Director of Public Utilities is hereby authorized to enter into a professional engineering agreement with Advanced Engineering Consultants, Ltd., 1405 Dublin Rd., Columbus, Ohio 43215, for the DOSD HVAC and Air Purification System Replacements, No. 1, in accordance with the terms and conditions of the contract on file in the Office of the Division of Sewerage and Drainage.

SECTION 2. That the City Auditor is hereby authorized to transfer of $400,000.00 from the Sanitary Sewer General Obligation Bond Fund 6109, per the account codes in the attachment to this ordinance.

 

SECTION 3. That the 2018 Capital Improvements Budget is hereby amended as follows:

 

Fund No. | Project No. | Project Name | Current | Revised | (Change)

6109 | 650870-101202 | Blueprint Miller Kelton - Kelton Fairwood | $450,000 | $50,000 | (-$400,000)

6109 | 650265-100100 | DOSD HVAC & Air Purification Sys Replc. No. 1 | $0 | $400,000 | (+$400,000)

SECTION 4. That the Director of Public Utilities is hereby authorized to expend up to $400,000.00 from the Sanitary Sewer General Obligation Bond Fund 6109 per the account codes in the attachment to this ordinance.

 

SECTION 5. That the said firm, Advanced Engineering Consultants, Ltd., shall perform the work to the satisfaction of the Director of Public Utilities and the Administrator of the Division of Sewerage and Drainage.

 

SECTION 6. That the City Auditor is hereby authorized and directed to transfer any unencumbered balance in the project account to the unallocated balance within the same fund upon receipt of certification by the Director of the Department administering said project that the project has been completed and the monies no longer required for said project; except that no transfer shall be made from a project account by monies from more than one source.

 

SECTION 7. That the City Auditor is authorized to establish proper project accounting numbers as appropriate.

 

SECTION 8. That the City Auditor is authorized to make any accounting changes to revise the funding source for all contracts of contract modifications associated with this ordinance.

 

SECTION 9. That the funds necessary to carry out the purpose of this Ordinance are hereby deemed appropriated, and the City Auditor shall establish such accounting codes as necessary.

 