File #: 0209-2019    Version: 1
Type: Ordinance Status: Passed
File created: 1/9/2019 In control: Public Utilities Committee
On agenda: 2/11/2019 Final action: 2/13/2019
Title: To authorize the Director of Public Utilities to enter into a construction contract with 2K General Company for the Home Road Property Demolition Project, in an amount up to $4,457,640.00; to provide for payment of prevailing wage services to the Department of Public Service in an amount up to $2,000.00; and to authorize an expenditure up to $4,459,640.00 within the Water General Obligation Bonds Fund; for the Division of Water. ($4,459,640.00)
Attachments: 1. ORD 0209-2019 Bid Tab, 2. ORD 0209-2019 QFF, 3. ORD 0209-2019 Information, 4. ORD 0209-2019 Utilization, 5. ORD 0209-2019 map, 6. ORD 0209-2019 Funding
Explanation

1.0 BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a construction contract with 2K General Company for the Home Road Property Demolition Project, in an amount up to $4,457,640.00, for Division of Water Capital Improvements Project No. 690026-100016, Contract No. 2139.

Funds in the amount of $2,000.00 will also be encumbered with the Department of Public Service for Prevailing Wage services.

Work consists of the demolition of 19 buildings of the former Scioto Juvenile Correctional Facility and Concord Township Fire Station, utility demolition, steam tunnel demolition, security fencing and asphalt pavement removal, surface grading, asbestos abatement, recycling of universal waste, disposal and abatement of petroleum and hazardous waste materials. The abatement includes the removal of asbestos materials within buildings, steam tunnels and buried steam lines. The project also includes the demolition of a former wastewater treatment plant, providing new electrical service to a pole barn and garage structure that are to remain, improvements to site drainage swales, new plantings, and other such work as may be necessary to complete the contract, in accordance with the drawings and specifications.

Planning Area = “99-N/A”; outside City boundaries

2.0 ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT:
Management of existing trees on the site will be performed in accordance with the City’s Tree Protection and Mitigation Policy. The majority of structures will not be reused by the City and should be demolished to reduce property operation and maintenance costs. Hazardous Materials abatement will be performed utilizing licensed providers. Following the demolition a riparian corridor will be maintained adjacent to the Scioto River to protect the water quality which is a water supply for the Dublin Road Water Plant.

3.0 CONSTRUCTION CONTRACT AWARD: T...