header-left
File #: 2139-2019    Version: 1
Type: Ordinance Status: Passed
File created: 7/25/2019 In control: Public Utilities Committee
On agenda: 9/16/2019 Final action: 9/19/2019
Title: To authorize the Director of Public Utilities to modify an existing professional engineering services agreement for construction administration and construction inspection (CA/CI) services with CTL Engineering, Inc. for the Volunteer Sump Pump Program Blueprint Linden 1, Phase 2 Project; to authorize an appropriation, a transfer within, and an expenditure of up to $429,175.39 from the Sanitary Sewer General Obligation Bond Fund, and to amend the 2019 Capital Improvements Budget. ($429,175.39)
Attachments: 1. Ord 2139-2019 Mod 4 CTL Director's Legislation Info Sheet, 2. Ord 2139-2019 SWIF 650876-111191 Sch 2A-1 New Utilization Form, 3. Ord 2139-2019 DAX Financial Form Vol Sump Pump BP Linden
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to modify (Mod #4) an existing construction administration and construction inspection (CA/CI) services agreement with CTL Engineering, Inc. for the Volunteer Sump Pump Program Blueprint Linden 1, Phase 2 Project, CIP 650876-111191. CTL Engineering, Inc. will perform CA/CI services for the Division of Sewerage and Drainage that commence construction during the years 2017 through 2019. This agreement will be modified as needed throughout the 3 year period to include these projects as they go to construction. Projects are located throughout the City of Columbus.

1.1 Amount of additional funds to be expended: $429,175.39
Original Contract $1,047,013.30
Modification #1 $1,472,807.13
Modification # 2 $ 502,748.40
Modification # 3 $ 73,110.14
Modification # 4 (current) $ 429,175.39
CONTRACT TOTAL $3,524,854.36

1.2 Reasons additional goods/services could not be foreseen:
This was a planned contract modification.

1.3 Reasons other procurement processes are not used:
This is a multiyear contract that will be modified as required to provide construction administration/inspection services for construction projects that commence during the three year (2017-2019) timeframe.

1.4 How cost of modification was determined:
The cost of Mod #4 was determined by negotiations between CTL Engineering and DOSD.
2. PROJECT TIMELINE: Work will be completed within the timeframe established by the individual construction contracts.

3. CONTRACT COMPLIANCE INFO: 31-0680767 | ASN | Exp. 08/01/2020 | Vendor #: 004209

4. EMERGENCY DESIGNATION: Is not requested at this time.

5. ECONOMIC IMPACT: Division of Sewerage and Drainage projects include rehabilitation and repairs to existing sewers, construction of new sewers, and construction of green infrastructure. The majority of the projects will...