header-left
File #: 0284-2020    Version: 1
Type: Ordinance Status: Passed
File created: 1/22/2020 In control: Public Utilities Committee
On agenda: 3/2/2020 Final action: 3/5/2020
Title: To authorize the Director of Public Utilities to modify the construction contract with Decker Construction Company for Utility Cut and Restoration Services for the Department of Public Utilities and to authorize the expenditure of $600,000.00 from the Water Operating Fund, $500,000.00 from the Sanitary Sewer Operating Fund and $50,000.00 from the Power Operating Fund. ($1,150,000.00)
Attachments: 1. 0284-2020 Financial Coding, 2. 0284-2020 Information
Background

This legislation authorizes the Director of Public Utilities to modify the construction contract for Utility Cut and Restoration Services with Decker Construction Company for additional funds in the amount of $1,150,000.00. Various types of utility excavations are performed within the City of Columbus' right-of-way by the Department of Public Utilities. The restoration work typically involves repair of existing pavement, curbs, and sidewalks in a manner conforming to the City of Columbus, Construction and Material Specifications (CMSC). The Department routinely outsources this restoration work to a contractor that is equipped and trained to make these repairs. Typical types of restoration work that require outsourcing involve the installation of wheelchair ramps, asphalt repair involving thermal bond heat weld repairs, asphalt milling machines capable of full width milling, and the delivery of flowable controlled density fill using volumetric mixer trucks.

CONSTRUCTION CONTRACT AWARD: The Director of Public Utilities publicly opened one bid on February 24, 2016 from the Decker Construction Company.

The bid from Decker Construction Company was deemed the lowest, most responsive and responsible bid. Vendor #004549, Contract Compliance Number is 31-0983557 (expires 10/25/19, Majority). The contract contains a multi-year renewal option.

Searches in the Excluded Party List System (Federal) and the Findings for Recovery list (State) produced no findings against Decker Construction Company.

FISCAL IMPACT: $1,150,000.00 is budgeted and needed for this contract. This ordinance is contingent on the passage of the 2020 operating budget, Ordinance 2926-2019.

Amount of additional funds: Total amount of additional funds needed for this contract modification is $1,150,000.00.

Total contract amount including this modification is $6,526,282.50 (2016 original contract: $1,460,622.50, 2017 Modification 1: $1,450,330.00, 2017 Modification 2: $100,00...

Click here for full text