File #: 0397-2020    Version: 1
Type: Ordinance Status: Passed
File created: 2/4/2020 In control: Public Service & Transportation Committee
On agenda: 3/2/2020 Final action: 3/5/2020
Title: To amend the 2019 Capital Improvement Budget; to authorize the transfer of cash and appropriation within the Streets and Highways Bond Fund; to authorize the Director of Public Service to enter into a contract modification with E.L. Robinson Engineering of Ohio Company in connection with the ADA Ramp Projects - 2018 General Engineering project; to authorize the expenditure of up to $35,000.00 from the Streets and Highways Bond Fund for the ADA Ramp Projects - 2018 General Engineering project; and to declare an emergency. ($35,000.00)
Attachments: 1. ord 0397-2020 ADA Ramp Projects-2018 GE mod 2
Explanation
1. BACKGROUND
This legislation authorizes the Director of Public Service to modify a professional services contract with E.L. Robinson Engineering of Ohio Company to add additional funds for design of the ADA Ramp Projects - 2018 General Engineering project.
Ordinance 1304-2018 authorized the Director of Public Service to enter into a professional services contract with E.L. Robinson Engineering of Ohio Company for the ADA Ramp Projects - 2018 General Engineering project. The intent of the contract was to provide the City of Columbus, Department of Public Service, with continuing contractual access to additional resources that are necessary to perform professional engineering and survey services and provide technical expertise to the Department in the implementation of roadway maintenance and ADA ramp projects. Improvement types within these projects are typically, but not limited to, the following: curb ramps, curb replacements, roadway resurfacing or improvements, sidewalk, roadside drainage and safety, and traffic pedestrian signals related to the resurfacing and ADA ramp work.

Ordinance 2657-2019 authorized the Director of Public Service to modify the contract in the amount of $40,000.00. This modification was needed to cover the cost of final work for Task 2 of the contract.

This ordinance authorizes the Director of Public Service to modify the contract in the amount of $35,000.00. This is an unplanned modification that is necessary to cover the cost of design for private encroachments discovered that will affect planned construction projects. It was deemed to be more cost efficient to modify the existing contract than to bid this part of the work.

The original contract amount: $250,000.00 (PO119637-1, Ord. 1304-2018)
Modification 1: $40,000.00 (PO199368-1, Ord. 2657-2019)
Modification 2: $35,000.00 (This Ordinance)

The contract amount including all m...