header-left
File #: 1273-2020    Version: 1
Type: Ordinance Status: Passed
File created: 5/22/2020 In control: Public Utilities Committee
On agenda: 6/15/2020 Final action: 6/18/2020
Title: To authorize the Director of Public Utilities to enter into a contract to allow for the Division of Sewerage and Drainage Surveillance Lab to provide lab analysis of samples and analytical services to The Ohio State University; and to declare an emergency. ($0.00)
Explanation

This legislation authorizes the Director of Public Utilities, Division of Sewerage and Drainage, to enter into a contract to allow for the Surveillance Lab to provide the testing and lab analysis of samples for The Ohio State University (OSU) while Heidelberg University’s Lab is closed. This work will consist of two separate research projects. The first project is a study looking at how land use affects water quality, and includes sampling in the Dayton metro area as well as in Battelle-Darby Metro Park. The second project is related to sampling of water quality through laboratory soil columns that approximate conditions that we’d expect in the bio-retention filters that have been built in Clintonville.

FISCAL IMPACT: The Division of Sewerage and Drainage will charge $125.00 per sample processed. The fees provided by The Ohio State University will offset the cost of providing the service. Revenues are not significantly impacted by this legislation.

EMERGENCY DESIGNATION: This ordinance is being submitted as an emergency because, without emergency action, no less that thirty-seven days will be added to this contract and the efficient delivery of valuable public services to OSU for the testing of the necessary samples would be delayed.


Title

To authorize the Director of Public Utilities to enter into a contract to allow for the Division of Sewerage and Drainage Surveillance Lab to provide lab analysis of samples and analytical services to The Ohio State University; and to declare an emergency. ($0.00)


Body

WHEREAS, the Ohio State University has two separate research projects that need to have testing and lab analysis services performed on samples. The first project will study how land use affects water quality and the second project relates to sampling of water quality through laboratory soil columns that approximate conditions that we’d expect in the bio-retention filters that have been built in Clintonville; and

WHEREAS, Heidelb...

Click here for full text