Explanation
This ordinance is to authorize the Director of the Recreation and Parks Department to enter into contract with ProCon Professional Construction Services for the Antrim Park Culvert Pipe Replacement project.
Background: This is an improvement project at Antrim Park to repair and replace a collapsed culvert pipe that connects the lake to the Olentangy River on the southeast side of the lake. On the river side, the headwall has settled about 24 inches and the drain gate, which prevents backflow of the river into the lake, has broken off. On the lake side, the bank has eroded and the culvert has become completely submerged with a headwall that has broken off.
To address this issue, a section of trail will need to be closed for approximately 3-weeks. Signage will be placed to maintain pedestrian traffic. We will install approximately 60’ of new 12-inch pipe with two new headwalls. A backflow device will be placed at the river side. Any damage to the path or surrounding area as a result of the construction will be restored.
Proposals were advertised through Vendor Services, in accordance with City Code Section 329, on May 12, 2020 and received by the Recreation and Parks Department on May 22, 2020.
Company Status Amount
ProCon Professional Construction Services (MAJ) $35,334.00
GM General Contracting, LLC (MAJ) $39,900.00
After reviewing the bids that were submitted, it was determined that ProCon Professional Construction Services was the lowest and most responsive bidder.
ProCon Professional Construction Services and all proposed subcontractors have met code requirements with respect to prequalification, pursuant to relevant sections of Columbus City Code Chapter 329.
Principal Parties:
ProCon Professional Construction Services
4000 Lockbourne Road
Columbus, Ohio 43207
Troy Dumm, 614.662.9152
31-1701026 ...