File #: 2048-2020    Version: 1
Type: Ordinance Status: Passed
File created: 9/7/2020 In control: Recreation & Parks Committee
On agenda: 10/5/2020 Final action: 10/8/2020
Title: To authorize the Director of Recreation and Parks to enter into contract with McDaniel’s Construction for the Athletic Complexes HVAC Renovation 2020 Project; to authorize the expenditure of $552,573.00 from the Recreation and Parks Voted Bond Fund; and to declare an emergency. ($552,573.00)
Attachments: 1. Athletic Complexes HVAC Renovation 2020 - DAX
Explanation

Background: This ordinance authorizes the Director of the Recreation and Parks Department to enter into contract with McDaniel’s Construction for the Athletic Complexes HVAC Renovation 2020 Project. The contract amount is $446,573.00, with a contingency of $100,000.00, for a total of $546,573.00. An additional $6,000.00 is being authorized for permit and inspection fees for a total of $552,573.00 being authorized by this ordinance.

Berliner, Big Run, McDonald, and Willis Athletic Complexes are the four facilities included in this project. The improvements include HVAC upgrades which will address adverse effects to the wood plank athletic floors as a result of humidity, improve user comfort, and provide increased energy use efficiency at these locations. The currently installed heating, ventilation, and air conditioning (HVAC) systems do not have the desired capability to control humidity. The roof also leaks where the existing exhaust fans are mounted. The HVAC systems will be altered to add re-heat capability that allows for humidity control. The roof mounted exhaust fans will be removed, the roof patched, and new variable frequency drive (VFD) fans, controlled by building pressurization sensors, will be installed in the wall.

Proposals were advertised through Vendor Services, in accordance with City Code Section 329, on June 23, 2020 and received by the Recreation and Parks Department on July 14, 2020. This project was also picked up by various local and regional plan rooms and distributed to their membership. Bids were received from the following companies:

Company Status Amount
McDaniel’s Construction Corp., Inc. (MBE) $446,573.00
General Temperature Control (MAJ) $448,000.00
Miles-McClellan Construction Co., Inc. (MAJ) $520,365.00

After reviewing the bids that were submitted, it was determined that McDaniel’s Construction was the lowest and most responsive bidder. McDaniel’s Construction and all proposed subcontractors have met code...