Title: To authorize the Director of Public Utilities to enter into a construction contract with Kokosing Industrial, Inc. for the DRWP Basin Clarifier Rehabilitation Project in an amount up to $19,521,350.00; to encumber $2,000.00 for prevailing wage services from the Department of Public Service; to authorize the appropriation and transfer of $19,521,350.00 from the Water System Reserve Fund to the Water Supply Revolving Loan Account Fund; to authorize the appropriation and expenditure of $19,521,350.00 within the Water Supply Revolving Loan Account Fund; to authorize a transfer and expenditure up to $2,000.00 within the Water General Obligations Voted Bond Fund; for the Division of Water; to authorize an amendment of the 2019 Capital Improvements Budget; and to declare an emergency. ($19,523,350.00)
Attachments: 1. ORD 2304-2020 Bid Tab, 2. ORD 2304-2020 QFF Eval Loan Funded, 3. ORD 2304-2020 Information, 4. ORD 2304-2020 Utilization, 5. ORD 2304-2020 DRWP map, 6. ORD 2304-2020 Funding
Explanation

1.0 BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a construction contract with Kokosing Industrial, Inc. for the Dublin Road Water Plant (DRWP) - Basin Clarifier Rehabilitation Project (hereinafter designated as “DRWP Basin Clarifier Rehabilitation Project”) in an amount up to $19,521,350.00; to encumber funds with the Department of Public Service for prevailing wage services in an amount up to $2,000.00; for Capital Improvements Project No. 690278-100005, Division of Water Contract Number 2199.

This project will construct clarifier improvements for basins 1, 2, and 3 and flocculator improvements in floc tanks 1 through 4 at the DRWP. Improvements in each basin will include replacement of four clarifier drive mechanisms, replacement of corner sweep mechanisms, rehabilitation of clarifier rake arms, and replacement of miscellaneous piping, supports, and other clarifier appurtenances, and replace all flocuclator drives.

The Community Planning Area is 99 - Citywide since the DRWP services several Columbus communities.

2.0 ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT: Clarifier and floc drives have been rehabilitated several times and are now past their useful life. Corner sweeps have been reconstructed by plant staff and are now past their useful life. Treatment chemicals added to basin contribute to degradation in equipment condition. The clarifiers and floc equipment is an integral part of the treatment process, and replacing these aging components will increase reliability.

3.0 CONSTRUCTION CONTRACT AWARD: The Director of Public Utilities publicly opened two (2) bids on September 23, 2020 from: Kokosing Industrial, Inc. and Kenmore Construction Co.

Kokosing’s bid was deemed the lowest, best, most responsive and responsible bid in the amount of $19,521,350.00. Their Contract Compliance Number is 47-2946608 (expires 6/12/21, Majo...