File #: 0625-2021    Version: 1
Type: Ordinance Status: Passed
File created: 3/4/2021 In control: Public Utilities Committee
On agenda: 3/29/2021 Final action: 4/1/2021
Title: To authorize the Director of Public Utilities to modify an existing engineering agreement with Korda/Nemeth Engineering, Inc. for the Blueprint Hilltop 4 Highland/Harris Integrated Solutions Project; to authorize the expenditure of up to $1,198,723.97 in funds from the Sanitary Sewer General Obligation Bond Fund; and to authorize an amendment to the 2020 Capital Improvements Budget. ($1,198,723.97)
Attachments: 1. ORD 0625-2021 Funding, 2. ORD 0625-2021 Utilization
Explanation

BACKGROUND: This legislation authorizes the Director of Public Utilities to modify an existing engineering agreement with Korda/Nemeth Engineering, Inc. for the Blueprint Hilltop 4 Highland/Harris Integrated Solutions Project. It is the objective of the City to mitigate DSRs (Designed Sewer Relief) overflows throughout the City’s collection system to the 10-year level of service. The City will evaluate and determine if this is best accomplished by eliminating inflow and infiltration into sanitary sewers, and constructing green infrastructure to retain and treat the resulting storm water.

Community Planning Area: 53 - Greater Hilltop

Renewal Information:

1.1 Amount of additional funds to be expended: $ 1,198,723.97
Original Contract $ 2,000,862.80
Renewal #1 $ 1,198,723.97
CONTRACT TOTAL $ 3,199,586.77

1.2 Reasons additional goods/services could not be foreseen.
This modification was anticipated.

1.3 Reason other procurement processes are not used:
Substantial information and knowledge has been developed by the consultant through work performed during the first three years of work on this engineering agreement. If the work to be performed under this modification was to be bid out separately, tasks already completed would be performed repetitively causing significant delays and incurring additional cost. Also delays would put the City at risk of missing consent order deadlines.

1.4 How cost of modification was determined:
A scope of services, consistent with the original proposal and contract, was developed and fee was negotiated between the City and consultant.

PROJECT TIMELINE: It is anticipated that this modification will be for a term of 2 years.

EMERGENCY DESIGNATION: Emergency designation is not requested at this time.

CONTRACT COMPLIANCE No.: 31-0922991 | MAJ | Exp. 4/30/2021 | Vendor # 004467

ECONOMIC IMPACT: This project is being completed as part of the City’s Blueprint Columbus program. This project wi...