File #: 0926-2021    Version: 1
Type: Ordinance Status: Passed
File created: 4/8/2021 In control: Public Utilities Committee
On agenda: 5/10/2021 Final action: 5/13/2021
Title: To authorize the Director of Public Utilities to modify an existing professional engineering agreement with Arcadis US, Inc. for the Jackson Pike Waste Water Treatment Plant (JPWWTP) Cogeneration Project; and to authorize the expenditure of up to $1,299,989.00 from the Sanitary Sewer General Obligation Bond Fund.
Attachments: 1. ORD 0926-2021 Funding Template, 2. ORD 0926-2021 Utilization
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to modify (#2) an existing professional engineering agreement with Arcadis US, Inc. for the Jackson Pike Waste Water Treatment Plant (JPWWTP) Cogeneration Project, CIP 650250-100007. The Jackson Pike Wastewater Treatment Plant creates large amounts of methane-rich digester biogas which is now burned in flares as a waste product. A feasibility study showed that installing a cogeneration system can beneficially use this biogas as fuel to create electricity that will supply about half the total electricity the plant uses, with an acceptable payback period and significant overall reductions in greenhouse gas emissions. The cogeneration system will be relatively large and complex. This project also includes design work for replacing certain plant boilers at the end of their useful life and improvements to the CMT facilities. This renewal purchases the first portion of the Step 3 Engineering Services during Construction for this project. Future legislation will purchase the remaining step 3 services during construction. Construction will be accomplished by others under a separate contract.

The construction work will occur at the Jackson Pike Wastewater Treatment Plant and has been designated as planning area 99, Citywide.

1.1 Modification Information: Amount of additional funds $1,299,989.00

Original Contract (Preliminary Design) $1,025,883.00
Modification 1 (Ord. 2924-2018) $ 2,309,950.00
Modification 2 (this mod) $1,299,989.00
Modification 3 (future planned) $1,907,793.00
ESTIMATED CONTRACT TOTAL $ 6,543,615.00

1.2 Reasons additional goods/services could not be foreseen:
This is a planned modification/renewal.

1.3 Reason other procurement processes are not used:
Re-bid of the project will likely result in a higher project costs as much of the project history would be lost and would need to be redi...