File #: 1136-2021    Version: 1
Type: Ordinance Status: Passed
File created: 4/29/2021 In control: Public Utilities Committee
On agenda: 5/17/2021 Final action: 5/20/2021
Title: To authorize the Director of the Department of Public Utilities to modify, and increase a contract with TFH-EB, Inc., dba The Waterworks for the Project Dry Basement: Backwater Valve Installation and Sump Pump program for the Division of Sewerage and Drainage, to authorize the expenditure of $18,221.13 from the Sewerage System Operating Fund, and to declare an emergency. ($18,221.13)
Attachments: 1. ORD 1136-2021 Financial Coding - Project Dry Basement - Mod #3, 2. ORD 1136-2021 Project Dry Basement - Mod #3
Explanation

This legislation authorizes the Director of the Department of Public Utilities to enter into contract modification No. 3 with TFH-EB, Inc., dba The Waterworks for the Project Dry Basement: Backwater Valve Installation and Sump Pump program for the Division of Sewerage and Drainage. The goal of this project is designed to prevent sewer backups in single and two-family homes in Columbus due to surcharging in city sewers from heavy rain or sewer blockages by protecting the home up to the top of casting of the nearest upstream manhole with a Spears or pre-approved backwater valve, which allows use of plumbing fixtures above that elevation in the remainder of the home. Only homes deemed eligible by the City of Columbus, Department of Public Utilities, Division of Sewerage and Drainage qualify for this project. Under this project an eligible home with an interior perimeter foundation drain connection to the lateral is also eligible, at the owner’s option for the installation of a sump pump that will redirect the foundation drainage away from the sanitary lateral to the sump pump and then discharge that drainage away from the house.

The Department of Public Utilities solicited competitive bids for the subject project in accordance with the relevant provisions of Chapter 329 of City Code relating to construction contracts. Three (3) bids (3 MAJ) were received on May 31, 2017. TFH-EB, Inc., dba The Waterworks was determined to be the lowest, responsive, responsible and best bidder.

This contract was estimated to last 3 years. It was estimated that 120 valves (40/per year) and 60 sump pumps (20/per year) would be installed during the 3 year term of the contract which was due to expire on December 12, 2020. Modification #2 extended the contract through February 28, 2021 and added additional funding. With the heavy rains of 2020 there has been an upsurge of new application requests returned since March of last year, with more coming in on a regular basi...