header-left
File #: 2705-2022    Version: 1
Type: Ordinance Status: Passed
File created: 9/28/2022 In control: Public Service & Transportation Committee
On agenda: 10/17/2022 Final action: 10/20/2022
Title: To authorize the Director of Public Service to enter into a contract modification with Lanham Engineering, LLC for the Signals - Downtown Signals Part 2 project; to authorize the expenditure of up to $200,000.00 from the Street Construction Maintenance and Repair Fund for the project; and to declare an emergency. ($200,000.00)
Attachments: 1. ORD 2705-2022 Accounting Template.pdf
Explanation
1. BACKGROUND
This ordinance authorizes the Director of Public Service to modify a professional services contract with Lanham Engineering, LLC to add additional funds for the design of the Signals - Downtown Signals Part 2 project.

Ordinance 0423-2022 authorized the Director of Public to enter into a professional services contract with Lanham Engineering, LLC for the Signals - Downtown Signals Part 2 project. The project consists of the reconstruction of existing traffic signals within the downtown area. The signals planned for this contract are at the intersections of E. Rich Street at S. 3rd Street, E. Rich Street at S. 4th Street, E. Rich Street at S. 5th Street, and E. Rich Street at S. Grant Street. This ordinance authorizes the Director of Public Service to modify the contract in the amount of $200,000.

This is modification that is necessary to cover the cost of work of the design for the project. The original contract was estimated before a scope and task list was prepared. It was deemed to be more cost efficient to modify the existing contract than to bid this part of the work.

The original contract amount: $300,000.00 (PO315528, Ord. 0423-2022)
The total of Modification No. 1: $200.000.00 (This Ordinance)
The contract amount including all modifications: $500,000.00

Searches in the Excluded Party List System (Federal) and the Findings for Recovery list (State) produced no findings against Lanham Engineering, LLC.

2. CONTRACT COMPLIANCE
Lanham Engineering, LLC’s contract compliance number is CC008525 and expires 09/03/2023.

3. FISCAL IMPACT
Funding for this contract is budgeted, available, and appropriated within Fund 2265, the Street Construction Maintenance and Repair Fund.

4. MINORITY AND WOMAN OWNED BUSINESS ENTERPRISE & SMALL LOCAL BUSINESS ENTERPRISE PROGRAM
This expenditure is to modify a contract that was put in place prior to the implementation of this pro...

Click here for full text