File #: 0955-2024    Version: 1
Type: Ordinance Status: Council Office for Signature
File created: 3/27/2024 In control: Public Utilities & Sustainability Committee
On agenda: 5/6/2024 Final action:
Title: To authorize the Director of Public Utilities to enter into a construction contract with General Temperature Control, Incorporated, for the Southerly Waste Water Treatment Plant East Aeration Control Building HVAC and Air Purification project; to authorize an amendment to the 2023 Capital Improvement Budget; to authorize the appropriation and transfer of funds from the Sanitary Sewer Reserve Fund to the Sanitary Revolving Loan Fund; to authorize the appropriation of funds within the Sanitary Revolving Loan Fund; and to authorize the expenditure of up to $7,585,290.00 from the Sanitary Revolving Loan Fund and the Sanitary Bond Fund to pay for the project. ($7,585,290.00).
Indexes: EBE Participation, MBE Participation, VBE Participation, WBE Participation
Attachments: 1. ORD 0955-2024 Utilization, 2. ORD 0955-2024 Accounting Template
Explanation
1. BACKGROUND
This ordinance authorizes the Director of Public Utilities to enter into a construction contract with General Temperature Control, Incorporated, for the Southerly Waste Water Treatment Plant EAC HVAC and Air Purification project, CIP #650372-100000, in an amount up to $7,583,290.00; and to encumber funds with the Department of Public Service for prevailing wage services in an amount up to $2,000.00, for a total expenditure of $7,585,290.00.

The HVAC & Air Purification Units in the Southerly Waste Water Treatment Plant (WWTP) East Aeration Building are approaching the end of their useful life and are becoming increasingly difficult to repair and maintain. Furthermore, the current configuration is inefficient and overly complex. The project consists of installing a new HVAC and air purification system according to the detailed plans and specifications set forth by the design engineer. This includes making necessary structural modifications to facilitate the system's installation, ensuring compliance with contemporary building standards, and integrating the system seamlessly with the facility's current Supervisory Control and Data Acquisition (SCADA) system, with the objective of achieving an upgraded, efficient, and fully functional system.

The Community Area for this ordinance will be 64, Far South.

TIMELINE: Contract work is required to be completed in a manner acceptable to the City within 365 days from the date that a Notice to Proceed (NTP) is given by the City.

ESTIMATED COST OF PROJECT: The bid amount and proposed award amount is $7,583,290.00, including a 10% construction contingency amount that will be utilized to fund needed and approved changes in the work. No contract modifications are anticipated at this time; however, construction exigency might later compel modification of this contract if unforeseen difficulties are encountered.

Cost summary:

Original Contract $7...

Click here for full text