File #: 1666-2021    Version: 1
Type: Ordinance Status: Passed
File created: 6/17/2021 In control: Public Utilities Committee
On agenda: 7/19/2021 Final action: 7/22/2021
Title: To authorize the Director of Public Utilities to renew and increase the professional engineering services agreement with Dynotec, Inc. for the Plant Drain & Water System Improvements Project; for the Division of Water; to authorize a transfer and expenditure up to $1,300,000.00 within the Water General Obligations Bond Fund; and to amend the 2020 Capital Improvements. ($1,300,00.00)
Attachments: 1. ORD 1666-2021 Information, 2. ORD 1666-2021 Utilization, 3. ORD 1666-2021 HCWP map, 4. ORD 1666-2021 PAWP map, 5. ORD 1666-2021 Funding
Explanation

BACKGROUND: This Ordinance authorizes the Director of Public Utilities to renew and increase the professional engineering services agreement with Dynotec, Inc. for the Plant Drain & Water System Improvements Project, Capital Improvements Project No. 690552-100000, Division of Water Contract No. 2091.

Design conventions and best practices for building drain systems have changed since the HCWP and PAWP were constructed. Currently, some drain systems discharge to undesirable locations or have the potential to mix incompatible chemicals, which does not meet best design practices and could adversely impact the environment or the drinking water supply when a chemical spill occurs. Plant water systems at the HCWP, PAWP, and DRWP need various improvements to address corroded pipe/fittings/couplings/supports/restraints, to add additional pipe supports, to provide pipe restraint, and replace aging valves. This project will modify the building drain systems to address these issues and will replace or modify various portions of the plant water systems to improve safety, reliability, and ease of maintenance.

Work under the original agreement included Condition Assessment & Preliminary Design (Step 1).

Contract Renewal No. 1 (current) will provide Detailed Design and Construction Bidding Services (Step 2).

Contract Renewal No. 2 (future) will continue to provide Engineering Services During Construction (Step 3).

Community Planning Area: “99 - Citywide”; both plants treat several communities throughout central Ohio.

Amount of additional funds to be expended: $1,300,000.00
Original Contract Amount: $ 275,300.00
Renewal 1 (current): $1,300,000.00
Total (Orig. + Renewal 1): $1,575,300.00

Reason other procurement processes are not used:
The services were discussed and included in the original RFP. The current consultant has since gained detailed knowledge of the existing facilities, and has completed preliminary design elements. Awarding this wor...