Explanation
1. BACKGROUND:
This legislation authorizes a modification to the engineering contract with American Structurepoint, Inc., formally known as American Consulting, Inc., for design services for sidewalks along Marion Road between Parsons Avenue and Lockbourne Road. The Transportation Division determined that construction of sidewalks along Marion Road were to be a part of the Operation Safewalks Initiative. Marion Road is uncurbed therefore the storm improvements and sidewalks will be constructed adjacent to each other outside the roadway. The storm improvements and sidewalks are interdependent requiring them to be designed at the same time.
2. FISCAL IMPACT:
There is sufficient cash and authority in the proper account for this project. This is a joint contract with the Transportation Division. The original contract was setup for the Stormwater portion only. The additional expenses for the design of the sidewalks are being paid by the Transportation Division.
3. CONTRACT COMPLIANCE:
Contract Compliance No.: 35-1127317, Expiration date: 12/11/2009, Majority
Title
To amend the 2007 C.I.B; to authorize the City Auditor to transfer funds within the Voted 1995,1999, 2004 Streets and Highways Fund; to authorize the Director of Public Utilities to execute a professional engineering services agreement modification with American Structurepoint, Inc. for design services for sidewalks along Marion Road between Parsons Avenue and Lockbourne Road; and to authorize the expenditure of $59,419.00 from the Voted 1995,1999, 2004 Streets and Highways Fund for the Sewerage and Drainage Division and Transportation Division. ($59,419.00)
Body
WHEREAS, Contract No. EL006694 was authorized by Ordinance No. 1841-2006, passed November 20, 2006; was executed January 10, 2007; and was approved by the City Attorney on January 23, 2007; and
WHEREAS, the Division of Sewerage and Drainage and Transportation Division engineering personne...
Click here for full text