header-left
File #: 0710-2008    Version: 1
Type: Ordinance Status: Passed
File created: 4/16/2008 In control: Utilities Committee
On agenda: 5/19/2008 Final action: 5/21/2008
Title: To authorize the Director of Public Utilities to modify and increase the professional engineering services contract with Dynamix Engineering Ltd.; to provide for preparation of "as-built" record drawings of the improvements constructed on the Hap Cremean Water Plant Asbestos Hazard Abatement & Heating System Replacement Project; for the Division of Power and Water; and to authorize the expenditure of $10,000.00 within the Water Works Enlargement Voted Bonds Fund. ($10,000.00)
Attachments: 1. ORD0710-2008 Legis. Info. form.pdf, 2. ORD0710-2008 map.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
5/21/20081 ACTING CITY CLERK Attest  Action details Meeting details
5/20/20081 MAYOR Signed  Action details Meeting details
5/19/20081 Columbus City Council Approved  Action details Meeting details
5/19/20081 COUNCIL PRESIDENT Signed  Action details Meeting details
5/12/20081 Columbus City Council Read for the First Time  Action details Meeting details
4/29/20081 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
4/28/20081 Utilities Drafter Sent for Approval  Action details Meeting details
4/28/20081 Auditor Reviewer Reviewed and Approved  Action details Meeting details
4/28/20081 CITY AUDITOR Reviewed and Approved  Action details Meeting details
4/28/20081 Utilities Drafter Sent for Approval  Action details Meeting details
4/28/20081 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
4/25/20081 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
4/25/20081 Utilities Drafter Sent for Approval  Action details Meeting details
4/25/20081 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
4/25/20081 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
4/25/20081 Utilities Drafter Sent for Approval  Action details Meeting details
4/25/20081 Finance Reviewer Reviewed and Approved  Action details Meeting details
4/25/20081 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
4/24/20081 Utilities Drafter Sent for Approval  Action details Meeting details
4/24/20081 Utilities Reviewer Sent for Approval  Action details Meeting details
4/23/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
4/22/20081 Utilities Drafter Sent for Approval  Action details Meeting details
4/18/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
4/18/20081 Utilities Reviewer Sent for Approval  Action details Meeting details
4/16/20081 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: This Ordinance authorizes the Director of Public Utilities to modify and increase the professional engineering services contract with Dynamix Engineering Ltd. for the Hap Cremean Water Plant Asbestos Hazard Abatement & Heating System Replacement Project, Division of Power and Water Contract No. 1047.

This is an unplanned modification that will provide for preparation of "as-built" record drawings of the improvements constructed with this project. This service is typically included in engineering services contracts that provide for construction administration/ construction inspection services. This task was inadvertently omitted from the project scope of work and therefore was not funded in the original contract. The engineering consultant has gathered the necessary information to prepare these drawings as part of the inspection services performed under the original contract. This proposed modification will cover the cost of preparing CAD drawing files of the information, engineering review of the CAD drawings, and printing costs to submit the information to the City. The total amount of this modification is $10,000.00, a 3% increase in the contract amount.

1. Amount of additional funds to be expended: $10,000.00
Original Contract Amount: $258,905.00
Amount of Modification #1: $74,688.19
Amount of original contract and two modifications: $343,593.19

2. Reasons additional goods/services could not be foreseen:
This work is typically included in engineering contracts that provide for Construction Administration/Construction Inspection services. The scope of work for these services was prepared by the design consultant and reviewed by the City project manager. As this is the first contract for this design consultant with the Division of Power and Water, he was not aware this task should have been included in his scope of work. The omission was not noted by the City project manager until the end of the construc...