File #: 1392-2013    Version: 1
Type: Ordinance Status: Passed
File created: 5/31/2013 In control: Public Utilities Committee
On agenda: 7/1/2013 Final action: 7/3/2013
Title: To authorize the Director of Public Utilities to enter into a construction contract with Complete General Construction Company, for the Cherry Street / Fourth Street Inflow Redirection and Town Street / Fourth Inflow Redirection Projects; to authorize the transfer of funds within the Sanitary Sewer General Obligation Bond Fund, to authorize the expenditure of $2,773,006.80, amend the 2013 Capital Improvement Budget, and declare an emergency. ($2,773,006.80)
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a construction contract with Complete General Construction Company for two projects: Cherry Street / Fourth Street Inflow Redirection (CIP 650707-100000) and Town Street / Fourth Inflow Redirection (650712-100000). Work to be completed by this contract includes replacement of two combined sewer regulating structures located in North Fourth Street in downtown Columbus; minor rehabilitation of 60-inch and 72-inch brick combined sewer and other such work as may be necessary to complete the contract in accordance with the plans and specifications.

2. THE PROJECT TIMELINE: Work is to be completed within 180 calendar days after the effective date of the Notice to Proceed.

3. PROCUREMENT: In accordance with the procedures set forth in Columbus City Code, Section 329.09 for competitive bids. Bids were opened on May 15th, 2013 and one (1) bid was received for the Cherry Street / Fourth Street Inflow Redirection and Town Street / Fourth Inflow Redirection Projects. The bid was awarded to Complete General Construction Company.

Name | CCCN | Exp. Date City/State _______Status
Complete General Construction Co. 31-4366382 | 11/01/2013 | Columbus, Ohio | MAJ

4. EMERGENCY DESIGNATION: An emergency designation is requested at this time as this project is a consent order project that is required to be completed by the end of 2013.

5. CONTRACT COMPLIANCE No.: Complete General Construction Company 31-4366382 | MAJ | Exp. 11/01/2013

6. ENVIRONMENTAL IMPACT: Project will reduce combined sewer overflows at two locations downtown, improve water quality in the Scioto River and comply with two requirements in the City’s consent order with Ohio EPA.

7. FISCAL IMPACT:
This ordinance authorizes the Director of Public Utilities to expend up to $2,773,006.80 in funds from the Sanitary Sewer System ...