File #: 1732-2016    Version: 1
Type: Ordinance Status: Passed
File created: 6/22/2016 In control: Public Service & Transportation Committee
On agenda: 7/18/2016 Final action: 7/21/2016
Title: To authorize the City Auditor to execute a cancellation of an existing purchasing document; to amend the 2016 Capital Improvements Budget; to authorize the City Auditor to transfer funds and appropriation within the Streets and Highways Bond Fund; to authorize the Director of Public Service to modify and increase the contract with Double Z Construction Company in connection with the Roadway Improvements - Smoky Row Road project;; to authorize the expenditure of up to $30,000.00 from the Streets and Highways Bonds Fund; and to declare an emergency. ($30,000.00)
Attachments: 1. 1732-2016 Legislation Accounting Templates.pdf
Explanation

1. BACKGROUND
This legislation authorizes the Director of Public Service to modify and increase an existing contract with Double Z Construction Company, in the amount of up to $30,000.00, for the Roadway Improvements- Smoky Row Road project.

This modification will fix problems with stormwater drainage and ponding at the intersection of Summit View and Smoky Row Road. This was not an anticipated modification. After initial completion of the improvement project at this intersection the Department of Public Service received 311 service requests and noticed that areas showed signs of standing water after rain events. Most of these areas will be corrected at no charge to the City as it was included in the original project scope of work. It has been determined there are other areas that were not addressed during the design and construction of this improvement. This modification will fund changes to significantly improve roadside drainage throughout the project corridor while addressing concerns of the residents.

Double Z Construction Company from the original contract with Public Service still has some remaining punch list work to complete on this project. It is most cost effective to have them finish the remaining punch list work and make these fixes at the same time. The modification will save time and construction fees as opposed to initiating a procurement effort for another construction contract specific to this project.

The original contract amount: $2,041,933.85 (EL017138, Ord. 1251-2015)
The total of Modification No. 1: $30,000.00
The contract amount including all modifications: $2,071,933.85

Searches in the System for Award Management (Federal) and the Findings for Recovery list (State) produced no findings against Double Z Construction Company.

Pre-Qualification Status
Double Z Construction and all proposed subcontractors have met c...