Explanation
1. BACKGROUND: This legislation authorizes the Director of Public Utilities to modify and increase an existing engineering agreement with Strand Associates, Inc. for the Sewer Maintenance Operations Center (SMOC) Facility Stormwater Improvements. The purpose of this project is to perform the requisite investigation, evaluation, formulation and design work to produce fully independent construction documents for the installation of green infrastructure (GI) technologies and other related activities and/or documents necessary for project completion of mitigating stormwater issues at SMOC.
1.1. Amount of additional funds to be expended: $208,933.10
Original Contract $349,829.39
Modification 1 (current) $208,933.10
Total $558,762.49
1.2 Reasons additional goods/services could not be foreseen:
This Contract Modification No. 1 was planned and anticipated, and stated in the original contract’s legislation. It is a planned continuation of the services originally included within the existing contract’s scope of service.
1.3 Reason other procurement processes are not used:
Re-bid of the project will likely result in a higher project costs as much of the project history would be lost and required to be rediscovered by another consultant unless won by the same consultant. In such a case, significant time would be wasted in acquiring and evaluating the new proposals without significant benefit.
1.4 How cost of modification was determined:
The costs of Contract Modification #1 were determined by negotiations between Strand Associates, Inc. and DOSD.
CONTRACT COMPLIANCE No.: 39-1020418 | MAJ | Exp. 9/25/2017| Vendor # 007735
ECONOMIC IMPACT: It is anticipated there will be reduced stormwater runoff from this SMOC Facility site and the water that does runoff into the storm system will have a higher quality and less pollutants. An informational sign will be installed to help educate the public to t...