File #: 1805-2017    Version: 1
Type: Ordinance Status: Passed
File created: 6/28/2017 In control: Public Utilities Committee
On agenda: 7/31/2017 Final action: 8/3/2017
Title: To authorize the Director of Public Utilities to enter into a construction contract with Fields Excavating, Inc. for the Maize Road Area Water Line Improvements (including 8th Avenue Water Line Improvements) Project; to authorize the appropriation and transfer of $3,487,042.65 from the Water System Reserve Fund to the Water Supply Revolving Loan Account Fund; to authorize the appropriation and expenditure of $3,487,042.65 from the Water Supply Revolving Loan Account Fund; for the Division of Water; and to authorize an amendment of the 2017 Capital Improvements Budget. ($3,487,042.65)
Attachments: 1. ORD 1805-2017 Bid Tab, 2. ORD 1805-2017 QFF, 3. ORD 1805-2017 Information, 4. ORD 1805-2017 SWIF, 5. ORD 1805-2017 map, 6. ORD 1805-2017 Funding
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a construction contract with Fields Excavating, Inc. for the Maize Road Area Water Line Improvements (including 8th Avenue Water Line Improvements) Project, Division of Water Contract Number 2048.

The purpose of this project is to construct necessary improvements to the water distribution system in the Maize Road area. The improvements identified in the scope of work will replace water lines that have high break histories and require frequent maintenance.

This project includes open-cut installation of approximately 940 linear feet of 6-inch water main, 9,200 linear feet of 8-inch water main, 4,400 linear feet of 12-inch water main and appurtenances, approximately 415 linear feet of 12-inch water main and appurtenances installed by horizontal directional drilling methods, and the replacement of 210 linear feet of 8-inch water main suspended from bridge crossings.

This project is in the “Downtown” and “North Linden” Community Planning Areas and includes the following streets: Maize Rd., Poling Ct., Reed Circle Dr., Loring Rd., Garden Rd., Wetmore Rd., Glenmawr Ave., N. 4th St., 8th Ave., and 2 bridge crossings near Goodale Ave. and I-670E.

2. ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT: The goal of this project is to replace or rehabilitate the existing 6-inch, 8-inch, and 12-inch water lines that have a high break frequency. Replacement of these water lines will improve water service, decrease burden on water maintenance operations, and reduce water loss. The Neighborhood Liaison(s) will be contacted and informed of this project during the design phase. Further community outreach may result through the Neighborhood Liaison Program.

3.1 CONSTRUCTION CONTRACT AWARD: The Director of Public Utilities publicly opened four (4) bids on June 21, 2017 from:

1. Fields Excavating, In...