header-left
File #: 0480-2018    Version: 1
Type: Ordinance Status: Passed
File created: 2/6/2018 In control: Recreation & Parks Committee
On agenda: 3/12/2018 Final action: 3/14/2018
Title: To authorize the Director of Recreation and Parks to enter into contract with O.A. Spencer, Inc. for a design assessment of the King Arts Complex; to authorize the expenditure of $31,645.40 from the Recreation and Parks Voted Bond Fund; and to declare an emergency. ($31,645.40)
Attachments: 1. King Arts Complex Imp Design
Explanation

Background: This ordinance authorizes the Director of the Recreation and Parks Department to enter into contract with O.A. Spencer, Inc. for a design assessment for the King Arts Complex.

Previous projects have addressed minor HVAC concerns as they arose, however the King Arts Complex is in need of a complete HVAC piping overhaul as well as potential redistribution of existing units to better service entire building. Renovations to the lobby, auditorium, and kitchen are a secondary priority as budget allows.

Phase I Assessment will review and investigate existing conditions so that thorough and accurate recommendations can be provided by the consultant. Once completed, the consultant will be able to provide a more conclusive scope of services for design and construction to provide the services the city is requesting.

Phase II will require a contract modification once we have an accurate assessment of existing conditions completed. This phase will be for the design of the improvements and construction administration services.

The costs for this project will be $16,645.40 with a contingency of $15,000.00 for a total of $31,645.40.

Bids were advertised through Vendor Services, in accordance with City Code Section 329, on August 30, 2017 and received by the Recreation and Parks Department on September 27, 2017. Bids were received from the following companies:

Company
Abbot Studios (MAJ)
HKI Associates (MBE)
OAS (MBE)
Star Consultants (MBE)
Triad Architects (MAJ)

Principal Parties:
O.A. Spencer, Inc.
343 East Livingston Avenue, Columbus, OH 43215
Othelda Spencer 614-461-1033
31-1574528
Exp. 8/25/18

Emergency Justification: An emergency is being requested in that it is immediately necessary to enter into said contract so Phase I investigation can begin as soon as possible and construction can begin in 2018.

Benefits to the Public: The King Arts Complex is a unique culture and arts institution which is comprised of the Barbar...

Click here for full text