File #: 1950-2018    Version: 1
Type: Ordinance Status: Passed
File created: 6/29/2018 In control: Public Service & Transportation Committee
On agenda: 7/30/2018 Final action: 8/3/2018
Title: To authorize the Director of Public Service to enter into a contract modification with Korda/Nemeth Engineering in connection with the Intersection Improvements - Main Street at McNaughten Road project; to appropriate funds within the Federal Transportation Grant Fund; to authorize the expenditure of up to $75,962.26 from the Streets and Highways Bond Fund and the Federal Transportation Grant Fund for the contract modification; and to declare an emergency. ($75,962.26)
Attachments: 1. 1950-2018 Legislation Template
Explanation
1. BACKGROUND
This legislation authorizes the Director of Public Service to modify a professional services contract with Korda/Nemeth Engineering to add additional funds for design of the Intersection Improvements - Main Street at McNaughten Road.
Ordinance 1393-2014 authorized the Director of Public Service to enter into a professional services contract with Korda/Nemeth Engineering for the Intersection Improvements - Main Street at McNaughten Road project. The project scope is to design improvements to the intersection of East Main Street at McNaughton Road and to the East Main Street corridor from McNaughton Road to Manor Drive to reduce congestion at the intersection of Main and McNaughton, improve safety, and address deficiencies in the pedestrian system. The amount originally legislated was the budgeted amount of $250,000.00 for the project, with a modification planned to add funds to complete the design work.

Modification #1 to the contract was an unplanned modification of $30,000.00 authorized by Ordinance 1836-2018 to support the completion of stormwater analysis and design and development of Best Management Practices in order to meet the requirements of the updated City of Columbus Stormwater Drainage Manual.

This ordinance authorizes the Director of Public Service to modify the contract in the amount of up to $75,962.26. This is a planned modification to authorize the completion of the contract scope and finish design of the project.

The original contract amount: $250,000.00 (EL016460, Ord. 1393-2014)
The total of Modification No. 1: $30,000.00 (ACPO003285, Ord. 1836-2018)
The total of Modification No. 2: $75,962.26 (This ordinance)

The contract amount including all modifications: $355,962.26

Searches in the System for Award Management (Federal) and the Findings for Recovery list (State) produced no findings against Korda/Nemeth Engineerin...

Click here for full text