header-left
File #: 0548-2020    Version: 1
Type: Ordinance Status: Passed
File created: 2/24/2020 In control: Public Utilities Committee
On agenda: 3/16/2020 Final action: 3/19/2020
Title: To authorize the Director of Public Utilities to enter into a construction contract with 2K General Company for the Dana G. Rinehart Public Utilities Complex Office Renovations Project; to authorize an expenditure up to $1,975,520.00 within the Water General Obligation Voted Bonds Fund; to provide for payment of prevailing wage services to the Department of Public Service, Design and Construction Division in an amount up to $2,000.00; for the Division of Water; and to amend the 2019 Capital Improvements Budget. ($1,975,520.00)
Attachments: 1. ORD 0548-2020 Bid Tab, 2. ORD 0548-2020 QFF Bond Funded, 3. ORD 0548-2020 Information, 4. ORD 0548-2020 Utilization, 5. ORD 0548-2020 map, 6. ORD 0548-2020 Funding
Explanation

1.0 BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a construction contract with 2K General Company for the Dana G. Rinehart Public Utilities Complex Office Renovations Project; in an amount up to $1,973,520.00; for Division of Water Capital Improvements Project No. 690026-100019, Contract No. 2281.

Funds in the amount of $2,000.00 will also be encumbered with the Department of Public Service for Prevailing Wage services.

With the construction of the new Coleman Office Complex several work groups relocated from the Rinehart Complex to that facility opening up space within the Dana G. Rinehart Utilities Complex for staff relocation. This project is being performed based on results of a space needs study to determine best use of the space for efficient workflow and staff organization.

This project consists of interior office renovation at 910 Dublin Road, 906 (910B) Dublin Road and 906B (918) Dublin Road, including mechanical, electrical, minor plumbing, technology, finishes and furniture work; window replacement, exterior building renovation and installation of a concrete sidewalk at 906B (918) Dublin Road, and other such work as may be necessary to complete the contract, in accordance with the drawings, technical specifications, and City of Columbus Construction and Material Specifications as set forth in this Invitation For Bid (IFB).

Planning Area: “68 - Dublin Road Corridor”

2.0 ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT:
The Dana G. Rinehart Public Utilities Complex Office Renovations project was designed following the results of the Utilities Complex Space Needs Study. This allowed for more efficient workflow and staff placement to better utilize the existing building infrastructure. The project will include installation of energy efficient LED lighting.

This project is also being performed in conjunction with the Rinehart ...