File #: 1602-2021    Version: 1
Type: Ordinance Status: Passed
File created: 6/11/2021 In control: Public Utilities Committee
On agenda: 7/12/2021 Final action: 7/15/2021
Title: To authorize the Director of Public Utilities to enter into a construction contract with the Righter Company for the Fairwood Pedestrian Bridge Rehabilitation; to authorize the expenditure of up to $220,320.00 from the Sanitary General Obligation Bond Fund; to authorize an expenditure up to $2,000.00 for prevailing wage services to the Department of Public Services from the Sanitary General Obligation Bonds Fund; and to amend the 2020 Capital Improvement Budget. ($222,320.00)
Attachments: 1. ORD 1602-2021 Funding Template, 2. ORD 1602-2021 Utilization
Explanation

BACKGROUND: This project will replace the top coating and reinforcing steel on the top of the DOSD Fairwood facility pedestrian bridge. A crack along the bridge will also be repaired and the hand railing will be recoated and re-installed.

Planning Area - 63 - Southside

PROJECT TIMELINE: Contract work is required to be completed in a manner acceptable to the City within 120 days from the date that a Notice To Proceed (NTP) is given by the City.

PROCUREMENT INFORMATION: The Division advertised for competitive bids submission for the subject services on the City's Vendor Services website and in the City Bulletin in accordance with the overall provisions of Chapter 329 of the Columbus City Code. The Division of Sewerage and Drainage received three (3) bids on April 28, 2021 from the following companies:

NAME TAX ID DAX # Expiration Status
Complete General 31-4366382 006056 6/8/2023 MAJ
The Righter Company 31-0889208 004433 12/17/2021 MAJ
Structural Systems Repair Not provided Not compliant N/A N/A


EMERGENCY DESIGNATION is not requested for this project.

ECONOMIC / ENVIRONMENTAL IMPACT: The rehabilitation of the bridge is more cost effective than a full replacement. This fix will stabilize the bridge and prevent further damage to the bridge deck.
FISCAL IMPACT: This ordinance requires an expenditure of up to $220,320.00 within the Sanitary Sewer General Obligation Fund 6109. An amendment to the 2020 Capital Improvement Budget is necessary to align the authority with the expenditure.

Title

To authorize the Director of Public Utilities to enter into a construction contract with the Righter Company for the Fairwood Pedestrian Bridge Rehabilitation; to authorize the expenditure of up to $220,320.00 from the Sanitary General Obligation Bond Fund; to authorize an expenditure up to $2,000.00 for prevailing wage services to the Department of Public Services from the Sanitary General Obligation Bonds Fund; and to amend the 2020 Capital Improvem...